Stoke Bardolph Biogas Plant

Biogas plant Stoke Bardolph (GB): EUCO® Titan 2000

Technical data:

  • Installed electrical output: 2 x 1063 kWel
  • Fermentation matter: Maize silage, whole plant silage
  • Commissioning: May 2010
  • Utilisation: The generated electrical and thermal energy is used for a neighbouring sewerage treatment plant operated by Severn Trent Water Ltd.
    Excess electrical energy is fed into the public grid.
Back